Engineering Status — Week 11
auto-generated
Mar 10 – Mar 16, 2025 ·
acme/app @ main
14
PRs merged
+3 vs wk10
6
Deploys
±0
1
Incidents
SEV-2 · 47m
3
Flaky tests fixed
suite now 99.1%
Highlights
- Bulk task editing shipped to 100%. The multi-select toolbar landed behind a flag on Monday and ramped to all workspaces by Thursday with no error-rate regression.
- Sync API p95 down 38%. Replacing per-task auth checks with a scoped batch lookup cut the hot path from 410ms to 255ms on the staging load test.
- One SEV-2 on Wednesday — a config rollout pushed a bad connection-pool limit to the sync workers. Mitigated in 47 minutes; full postmortem linked below.
Shipped
| PR | Title | Author | Risk |
|---|---|---|---|
| #4871 | Bulk edit toolbar: selection model + keyboard shortcuts | Mira Okafor | Med |
| #4874 | Batch auth lookup for /v2/sync hot path |
Devon Park | Med |
| #4878 | Fix race in attachment uploader retry loop | Sam Reyes | Low |
| #4879 | Migrate reminder scheduler to idempotent job keys | Priya Anand | High |
| #4882 | Board view: collapse empty swimlanes by default | Mira Okafor | Low |
| #4885 | Quarantine 3 flaky webhook integration tests | Jules Tan | Low |
| #4888 | Connection pool limits configurable per worker tier | Devon Park | Med |
| #4891 | Dark mode pass on settings & billing panels | Noor Halabi | Low |
Velocity
PRs merged per day. Thursday spike is the bulk-edit feature train (4 PRs landed together).
Carryover
In review
Workspace export to CSV — waiting on pagination review.
· Sam Reyes
Blocked
SSO group mapping — blocked on staging IdP credentials from IT.
· Priya Anand
Slipped
Mobile push reliability dashboard — deprioritized for incident follow-up.
· Devon Park